Design Studies for Muara Angke Embankment Project Proposed in APBD-P
Reported by Budhi Firmansyah Surapati | Translated by Nugroho Adibrata
Jakarta Transportation Dept. is going to propose the study of the Detailed Engineering Design (DED) for development of tidal wave embankments in Muara Angke, Pluit, Penjaringan, North Jakarta in 2017 Amendment City Budget (APBD-P).
Hopefully, after the project is finished, inundation problem in Muara Angke will be resolved
Jakarta Transportation Dept. Vice Head, Sigit Wijatmoko said his dept. could get the DED for the embankment project, after the proposal is approved in this year's APBD-P.
Djarot Wants APBD-P 2017 and RAPDB 2018 Discussed At The Same Time"Therefore we want to propose the DED first in APBD-P," he stated, Wednesday (5/31).
He needs to know first about the topography and span of the required sheet pile. After the proposal is approved in APBD-P, it will be continued with embankment project in 2018.
"Hopefully, after the project is finished, inundation problem in Muara Angke will be resolved," he said.